Jerith Home Additions & ADU: The Pasadena Owner’s Guide
We stock and install Jerith-compatible components for home additions and ADU projects in Pasadena, with typical installed pricing for Jerith-integrated addition work running $45,000-$130,000 depending on scope and existing structure condition. Most Jerith material calls we field in Pasadena come from owners who bought a property with an existing Jerith fence, gate, or railing system abutting a planned addition or ADU footprint, then discovered the metalwork conflicts with setback requirements or footings. The part that “fails” is rarely the Jerith product itself - it’s the integration detail between the existing Jerith installation and the new foundation or wall line that was never designed to coexist.
Which Jerith Models This Applies To
Jerith’s residential lines divide into three families: the Classic series (1-inch square aluminum tube, pressed spear or flat-top picket), the Styleline series (narrower 3/4-inch tube, tighter picket spacing), and the Ovation series (heavier-wall commercial-grade, often used for pool enclosures and perimeter security in Pasadena’s hillside zones below the Angeles National Forest. The model stamp is embossed on the inside face of the bottom rail, visible once you remove the end cap with a flathead screwdriver.
The compatibility question for additions and ADUs is not which Jerith series you own, but whether it was installed with surface-mounted posts (bolted to a concrete curb or deck) or core-drilled posts (set in concrete below grade). Surface-mounted Jerith posts can usually be detached and reinstalled; core-drilled posts become part of your addition’s foundation math. We see this mismatch most often in Pasadena’s Bungalow Heaven district, where 1920s concrete walks were poured shallow and a Jerith gate was core-drilled through them decades later. The Haven Standard requires us to photograph the post embedment depth before we quote, because a 30-inch footing for your addition may conflict with a 24-inch Jerith post that someone assumed was decorative.
We are an independent service provider, not affiliated with Jerith. For OEM replacement pickets, rails, or hardware, we source through Jerith’s distributor network; for structural integration with new construction, we engineer our own attachment details and specify the aluminum alloy grade (6063-T6 for most Jerith-compatible fab work) in the written scope.
Signs Your Jerith Home Additions & ADU Is Failing

- Gate drag or latch misalignment on the Jerith gate adjoining your addition wall. The cause is usually differential settlement between the original Jerith post footing and the new addition slab, which moves at different rates in Pasadena’s expansive clay soils. We measure the gap with a 4-foot level; anything over 3/8 inch in 48 inches means the integration detail has failed, not the Jerith product.
- White aluminum oxide blooming at the base of Jerith posts where they meet new concrete. This is galvanic corrosion accelerated by moisture trapped between dissimilar materials - the aluminum post, the steel rebar in your addition footing, and the calcium hydroxide in fresh concrete. In Pasadena’s winter rain cycles, this shows up 18-36 months after integration if a proper isolation sleeve was omitted.
- Picket looseness or rail sag in Jerith sections that were cut and reattached during addition construction. Jerith’s snap-together rail system relies on exact tube lengths; field cuts with abrasive blades can deform the rail interior so pickets no longer lock. We stock rail splicing sleeves and replacement rail sections for this exact failure mode.
- Permit red-tag at inspection because the Jerith fence no longer meets setback or height requirements after the addition footprint changed. Pasadena’s zoning enforcement flagged 14 properties for this in 2023-2024, typically where a rear-yard setback shrank from 25 feet to 15 feet after an ADU was added. The Jerith fence was legal when installed; the addition made it non-conforming.
- Gate operator strain or motor failure on an automated Jerith driveway gate integrated with new addition hardscaping. The operator was spec’d for a free-swinging gate on level hinge posts; your addition’s paver grade change or retaining wall shifted the geometry. We see this on Madison Avenue properties where the driveway was regraded for garage conversion ADUs.
Before
AfterReplacement Cost & What’s Included
| Scope | Pasadena Price Range | What’s Included |
|---|---|---|
| Jerith post extraction + reinstallation with new footing | $1,800-$4,200 per post | Concrete demo, rebar tie to addition footing, post reset, alignment check |
| Jerith rail/picket replacement (cut section) | $340-$780 per 6-foot section | OEM or 6063-T6 match, color-matched powder coat, snap-lock reinstall |
| Full Jerith gate rebuild with operator rehang | $2,800-$6,500 | Gate fab or OEM, hinge post adjustment, operator remount and limit reset |
| Jerith fence relocation for setback compliance | $4,500-$12,000 | Full removal, new post layout, reinstallation, Pasadena zoning compliance letter |
| Home Addition with Jerith integration (full project) | $45,000-$130,000 | Written scope, permit pull, documented photo record, 365-Day Done Right Promise |
The wide range on full additions reflects foundation type: stem-wall on grade in Pasadena’s flatlands near the 210 versus hillside caisson work in Linda Vista, where Jerith pool enclosures often complicate the geotechnical plan. Under Clause 1 of the Haven Standard, the price is written before anyone starts - every line item shows labor, materials, and Jerith-compatible components separately. No change proceeds without a signed change order, which is why our projects finish within a few percent of the agreed number across 4,000-plus jobs since 2007.
DIY or Call Us?

What you can safely check: the model stamp location (inside bottom rail), whether posts are surface-mounted or core-drilled (wiggle test - surface mounts have visible base plates with anchor bolts), and whether your addition permit set shows the Jerith fence in the site plan. Pasadena’s Building & Safety counter will let you verify setback compliance with the parcel number; that’s public record, no contractor needed.
Where DIY goes wrong: cutting Jerith rail with anything but a fine-tooth carbide blade deforms the tube interior and voids the snap-fit warranty. More critically, any work within 18 inches of a gas meter, electrical service, or sewer lateral - common in Pasadena’s tight side yards - requires utility locate by law. We’ve been called to jobs where a homeowner core-drilled through a 2-inch gas line that the Jerith installer had routed behind a post in 1987. The administrative discipline Haven acquired Rowan for exists precisely because surprises like that cost more than the original fence.
Write it down before you build it - scope first, surprises later. Call (562) 203-4508 to schedule your free estimate. We also stock parts for KraftMaid, Cambria, and Silestone installations when your addition includes kitchen or bath buildouts.
FAQs
Jerith’s powder-coated aluminum carries a lifetime limited warranty against structural failure, but the integration details with your addition have a shorter horizon. In Pasadena’s combination of intense UV, winter moisture, and expansive clay, we see post-footing separation or galvanic corrosion at the 15-25 year mark if isolation details were skipped. Call (562) 203-4508 for an exact quote on preventive remediation - estimates are free.
Yes, if the aluminum extrusions themselves are intact. Bent pickets, failed snap-locks, or corroded base plates are all replaceable with OEM or matched aftermarket parts. We only recommend full replacement when the post embedment depth conflicts with new foundation work, which is a structural issue, not a fence issue. Call (562) 203-4508 for an exact quote - estimates are free.
A single post extraction, refooting, and reset takes one crew day if no utilities are involved; a full setback-compliance relocation of 40 linear feet takes 3-5 days including concrete cure time. We pull permits as needed and schedule Pasadena inspection before we leave the site. Call (562) 203-4508 to schedule your free estimate.
We stock 6063-T6 rail, pickets, and snap-lock hardware in black and bronze, the two most common Jerith colors in Pasadena. For less common colors like green or white, we order from Jerith’s distributor with a 10-14 day lead time, or we can match-powder-coat in our supplier’s Santa Fe Springs shop. Call (562) 203-4508 to confirm color availability for your project.
Written by Grant Rowan, Owner, Rowan Construction Group Pasadena at Rowan Construction Group Pasadena, serving Pasadena and nearby areas.